0% Finance Available  ·  Ask about finance

Interior Spray Painting in Hull

Walls, ceilings, woodwork, staircases and fitted furniture sprayed to a smooth, even finish in Hull homes. From £800. 5-year written guarantee.

Get a free quote Call 07977 189905

Interior Spray Painting in Hull: Prices and What to Expect

From our workshop in Sheepscar, Leeds, 61 miles away (1 hour 11 minutes), ColourHaus spray paints walls, ceilings, interior doors, skirtings, staircases and fitted furniture in Hull homes, using HVLP equipment for a finish with no brush marks or roller texture (our guide compares spraying with brush and roller decorating). A single room's woodwork typically starts from £800 and a full room including walls and ceiling usually costs £1,200 to £2,500; every job starts with a free home visit and a fixed-price written quote within 48 hours, and carries a 5-year written guarantee, as set out on our interior spray painting service page.

Of the roughly 115,500 households across the Hull City Council area, 47% live in terraced houses, and the largest group of properties (23%) was built between the wars (1919 to 1939). Those 28,600 of the 125,050 properties in the Valuation Office count, the inter-war homes, often have solid-plastered walls, original staircases and panelled doors carrying many coats of paint, which is where spraying shows its value.

Prices and timings

Single room's woodworkFrom £800
Full room with walls and ceiling£1,200 to £2,500
Time on site1 day for woodwork; 2 to 3 days for a full room
Guarantee5 years, written
FinishesWalls: matt or eggshell; woodwork: eggshell, satin or gloss
Colours175,000+ across RAL, Farrow & Ball, Little Greene and Dulux Trade, or matched to a sample
From our Leeds workshopabout 1 hour 11 minutes by road (61 miles)

Get a free Hull quote

Where Spraying Makes the Biggest Difference in Hull Homes

  • Hall, stairs and landing. In the terraced and semi-detached houses that make up 76% of homes across the Hull City Council area (about 87,900 households), the stairs usually rise straight from the hall, so the spindles, handrail and doors are the first thing anyone sees; spraying them together means one round of masking.
  • Flats. 15% of homes across the Hull City Council area are flats, where open-plan walls and ceilings form large, uninterrupted areas that show roller marks in side light and suit a sprayed finish.
  • Doors, frames and skirtings. 44% of properties (about 55,600) were built between 1945 and 1999, and their flush or moulded-panel doors and softwood skirtings have usually been brush-painted several times; keyed and sprayed, they come back to a hard, clean finish.
  • Period joinery and plasterwork. With 43% of properties built before 1939, panelled doors, moulded skirtings, picture rails and, in the oldest rooms, cornicing are part of the picture, and those profiles are where brush marks collect while a sprayed coat stays crisp.
  • Walls and ceilings. Only 13% of homes (about 15,900) date from 2000 or later, so most walls here have been repainted many times; spraying gives flat, even coverage with no roller stipple or lap lines.
  • Fitted furniture and radiators. Wardrobes and alcove units are sprayed in place, and radiators in heat-resistant coatings; see fitted furniture spraying.
Restaurant interior with pale blue sprayed woodwork panels and pillars
Restaurant woodwork, from our gallery

Hull Homes in Numbers

What the official figures say about the homes across the Hull City Council area, and what that means for an interior spray finish.

Hull at a glance

CouncilHull City Council
CountyEast Riding of Yorkshire
From our Leeds workshopabout 1 hour 11 minutes by road (61 miles), to the east
Households counted115,471 across the whole Hull City Council area
Owner-occupied48% (average across the towns we cover: 63%)
Privately rented24% (average 19%)

Type of home

Detached8% avg 20%
Semi-detached29% avg 37%
Terraced47% avg 27%
Flats15% avg 15%

When the homes were built

Built before 191920% avg 21%
1919 to 193923% avg 16%
1945 to 197222% avg 26%
1973 to 199922% avg 19%
2000 onwards13% avg 17%

What the age of Hull homes means for the paintwork

Only 20% of the 125,050 properties in the Valuation Office count were built before 1919, close to the 21% average across the towns we cover. With 80% built since, most walls here are gypsum plaster or plasterboard, which suit a sprayed emulsion over a mist coat or primer, and lime plaster is the exception rather than the rule.

Homes built between 1919 and 1939 make up 23% of the stock, above the 16% average across the towns we cover. Those 28,600 inter-war homes often keep picture rails, plaster coving and panelled or part-glazed doors, detail where brush marks and drips collect and a sprayed coat stays crisp. 22% of properties were built between 1945 and 1972, below the 26% average across the towns we cover. In those 28,000 or so homes the walls are usually hard gypsum plaster, which takes a sprayed emulsion well, but textured ceiling coatings were common from the 1960s, which is worth knowing before any ceiling preparation starts.

Houses, flats and the shape of the job

Terraced houses make up 47% of homes across the Hull City Council area, well above the 27% average across the towns we cover, and detached houses only 8%; in most terraces the staircase rises from a narrow hall, so the hall, stairs and landing are best masked and sprayed as one job rather than three, and where parking is on the street we plan unloading for the start of the day and keep equipment inside the house.

Owners, landlords and choosing the finish

24% of homes are privately rented, above the 19% average across the towns we cover, and 48% owner-occupied; for a landlord the useful thing about spraying is a predictable timetable: a room's woodwork is usually one day and a full room two to three, so a fixed scope can be set against a void period, and a hard, wipeable finish copes better with tenancy changeovers than a soft matt emulsion. A further 27% are social rented (well above the 17% average); councils and housing associations usually arrange redecoration of their own homes, so this service is mainly for owner-occupiers and private landlords.

How Hull compares with nearby towns

20% of properties here were built before 1919, compared with 4% in Anlaby and 10% in Cottingham, so period preparation is more likely to be part of a job here than next door. The type of home differs too: 8% of homes here are detached, against 18% in Anlaby and 27% in Cottingham. For newer housing the figures are 13% built since 2000 here, 11% in Anlaby and 19% in Cottingham.

Sources: ONS Census 2021, tables TS044 (accommodation type) and TS054 (tenure), via Nomis, for the whole council district; Valuation Office Agency, Council Tax: stock of properties 2025 (CTSOP4.1, build period, 31 March 2025); OS Open Names and ONS Postcode Directory via postcodes.io; OSRM routing on OpenStreetMap data, from LS7 1AH. "Average" is the household-weighted average across the 203 towns and villages on our areas page. Figures compiled 2026-10-19.

How an Interior Spraying Job Runs

  1. Free home visit with spray samples
  2. Fixed written quote within 48 hours
  3. Masking of floors, fittings and furniture
  4. Filling, sanding and priming
  5. Spraying, walkthrough and written guarantee

With 47% of homes across the Hull City Council area terraced, 15% flats and 8% detached, hallways are often narrow, so equipment stays in one room and the hall floor is fully protected before anything is carried through.

Where We Work Around Hull

Getting to Hull

Hull is 61 miles and about 1 hour 11 minutes by road from our Leeds workshop, which is a long way for a small team, so we take on work here when the job is a good fit, planned in one block. If we can't offer a sensible price for the distance, we will say so at the quote stage rather than after.

Get a Free Interior Spraying Quote in Hull

Tell us a little about the job. We reply within 2 working hours and send a fixed-price written quote within 48 hours of the consultation.

We use your details only to reply to this enquiry. See our privacy policy.

What Customers Say About Our Interior spray finish Work

★★★★★
“Julian and team gave a new lease of life to our fitted wardrobes, inside and out, from a dark wood to a fresh off-white. Great attention to detail and mess free.”
Neil Hawkins · July 2021 · Google review
★★★★★
“A massive thank you to Matt and his team. They spray painted all my internal doors and transformed my bedroom by decorating and spraying the fitted wardrobes. Absolutely thrilled.”
Sarah Metcalfe · April 2021 · Google review
★★★★★
“After moving in we had built-in wardrobes but didn't like the doors. Instead of paying for new doors we had the current ones re-painted, and they look brand new!”
Ben Callender · January 2020 · Google review

These are genuine Google reviews of our interior spray finish work from customers across Yorkshire, not only Hull. Read all our reviews.

Interior Spraying in Hull: Questions

How much does interior spray painting cost in Hull?

A single room's woodwork (skirting, architraves and one door) typically starts from £800 and a full room including walls, ceiling and all woodwork typically costs £1,200 to £2,500, always as a fixed price with no day rates; 47% of homes across the Hull City Council area are terraced (against 8% detached), and compact rooms keep a job towards the lower end, although the high ceilings of older terraces add time.

How long does interior spraying take in a Hull home?

A room's woodwork takes one day, a full room including walls and ceiling two to three days, and a whole house is planned room by room so you can keep using the rest of it; Hull is about 1 hour 11 minutes by road (61 miles) from our workshop in Sheepscar, and multi-day jobs are booked on consecutive days.

Can you respray a rented property in Hull between tenancies?

Yes; 24% of homes across the Hull City Council area are privately rented, and for a let property a hard, wipeable finish is the practical choice; give us the void dates when you enquire and we will set the scope to fit them: one day for a room's woodwork, two to three days for a full room.

Can you spray paint inside a flat in Hull?

Yes; flats make up 15% of homes across the Hull City Council area, and the work stays within your own rooms with full masking and low-overspray HVLP equipment, but check whether your lease needs the managing agent or freeholder to approve contractors, and tell us about lifts, stair access and parking when you book.

How far is Hull from ColourHaus?

Our workshop is at Unit 9 Taverners Walk, Sheepscar, Leeds LS7 1AH. Hull is about 61 miles by road, roughly 1 hour 11 minutes away, to the east. We confirm visit dates and anything distance-related in your fixed-price quote before you commit.

What kind of homes do you work on in Hull?

All kinds. Across the Hull City Council area, the most common home is a terraced house (47% of households, Census 2021), and 23% of properties were built between the wars (1919 to 1939) (VOA, 2025); an interior spray finish works in any of them, and what changes is access, room size and the materials we find.